Additional Information/Acknowledgement

Dear valued proponents,

Dzongkhag Environment Office would like to acknowledge the receipt for following application for Environment Clearances. However, on reviewing your application, following documents (see the table bellow) are required to submit for further reviewing your activity and for the approval.

The office will communicate for further necessary action after submission of additional documents/information asked.

Thank you 

Please submit following additional information/document
SL.No Promoter  Type of activity  Date of application received  Date of additional Information asked Additional Information/document 
1

Thinley Tenzin (ED)

Gaseb Construction Pvt.Ltd

Installation of stone crusher plant at Maoh-Khola, Gelephu Gewog 21 June 2019 26 June 2019

 

EC issued only for crusher plant (02 September)

2

Dekiling Phuntshok Yangkhil Detshen

Mr. Chador Wangdi

Mr. Sonamla

Mr. Mahindra Rai

Installation of stone crushing plant at the confluence of Dolkhola and Lau-pani stream 20 June 2019 26 June 2019

EC renewed on 20/11/2019 to last four proposal upon submission of additional documents on the same date 

 

3

Mr. Choden Mukhia, CEO 

Druk Wood Manufacturing Group 

Installation of sawmill machine at Dechen-Pelri village, Gelephu Gewog  07 June 2019 07 June 2019
  1. Duly filled IEE (Initial Environment Examination Form) 
  2. Project proposal 
  3. Forestry Clearance main activity. Also forestry clearance for ancillary activity/facilities if required.
  4.  Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 

 

4

Manager 

BPCl , Gelephu

construction of electric supply line and transformer  02 August 2019 02 August 2019

E C issued on 5 September 2019

5

Gup

Gakiling Gewog 

Construction of Chiwog meeting hall  02 August 2019 02 August 2019

 E C issued on 20/11/2019 after submitting addidional documents on 13/11/2019 

6

Jit Bdr. Sarki

CID No. 113160002

Gelephu Gewog

Establishment of stone crushing plant at Threwar Khola 08 August 2019 08 August 2019

Environment Clearance for the construction/setting up of crusher plant is issued on 9/10/2019 after submission of all additional documents on the same date 

7

Mr. Roshan Rasailay

CID No.11316000138

Chokhorling Dekiling Gewog

Establishment of Manufacturing unit for production of pen, pencils, chalk, eraser and sharpner out of paper waste 31 July 2019 31 July 2019

Application forwarded to NECS 

8

Sonam Phuntsho 

Thimphu

(Dragon Packaging Industry)

Production of packaging paper bags in Jigmeling Industrial Park  11 June 2019 11 June 2019
  1. Incomplete filling of IEE form (proponent have not signed on IEE form) 
  2. Project proposal is inadequate and given wrong information. Kindly submit better and professional project proposal. 
  3. Committee went to inspect site. However, proponent is yet to identify the provisional leased land location. Site visit is on pending from proponent side. 
9

Tashi Zangmo 

Autsho, Tolenkhar Gewog, Lhuntse Dzongkhag

Production of best quality ply wood at Jigmeling Industrial Park  11 June 2019 11 June 2019
  1. Incomplete filling of IEE form (proponent have not signed on IEE form) Please fill IEE form and kindly submit it to Dzongkhag Environment Office 
  2. Forestry Clearance the activity  

 

10

Jamyang 

General Manager 

Tashi InfoComm. Ltd

Construction of mobile base station at Noonpani, Gakiling Gewog  27 May 2019 27 May 2019

 

Application fee (2500) submitted and EC issued 

 

 

11

Ms. Purba Maya Ghalley 

Ms. Tulasi Ram Rimal 

Mr. Sangay Tshering 

Chokhorling, Dekiling Gewog

 

Construction of approach road to plots  19 April 2019 19 April 2019
  1. Duly filled IEE (Initial Environment Examination Form) 
  2. Gewog Administrative Approval. This should be supported by public clearance of the affected area.
  3. Forestry clearance for the construction of road alignment.
  4. Sketch map or exported map from google earth of the proposed alignment.
  5. Lag Thram Copy of the all proponent 
  6.  Environment Clearance Processing and Application fee. (Nu.2/- per meter + Nu.500/-)
12

Mr. Kinzang Namgyel 

CID No: 10102002549

Chumey, Bumthang

Establishment of stone crushing unit at Lalai Dab, Umling Gewog  19 July 2019 19 July 2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction
  3. Public clearance verified by concern local authority. (signature on public clearance submitted is from the proponent and you are requested to submitted from affected individuals)
  4. Assurance letter from BPC (Bhutan Power Corporation)
  5. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
13

Mr. Chimi Drukpa, CID No: 10101005098

 

Surface Collection cum establishment of stone crushing plant at Taklai Khola, Umling Gewog  02 January 2019

02 January 2019

  1. Project proposal is inadequate. Submit better and professional project proposal. 
  2. Forestry clearance for surface collection, road construction, electricity supply line construction, water supply line. 
  3. Gewog Administrative Approval from Umling and Chuzergang Gewog. This clearances should be supported by public clearance of the affected area.
  4. Assurance letter from Bhutan Power Corporation Ltd for energy supply to the proposed activity. 
  5. Environment Clearance for surface collection from your private land. 
  6. Duly filled IEE form (attached)
  7. Clearance form Lothuen Chuyur Tshogpa of Chuzergang after studying the impact of the proposed activity to the irrigation system of Taklai Irrigation Scheme. 
  8. Gewog Administrative Approval from Adjacent Gewog owing to the damage it may cause to the GC road due to movement of heavy vehicle/machineries.
  9. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site).
14

Mr. Lhakpa Tamang 

CID No- 11311000863

Dargaythang, Shompangkha 

Construction of automobile workshop at Dargaythang  12 April 2019 12 April 2019

Upon site inspection, the proposed activity falls within the buffer zone prescribed in water regulation of Bhutan. This activity was discussed in the DEC and resolved to deny its approval. 

 

15

Mr. Chencho Gyeltshen 

CID 10808000169

KD stone Crushing Pvt Ltd

Changing ownership of the Environment Clearance 03 August 2018 03 August 2018

Application Fee (Nu.500/-)

Detail address of new proprietor to reflect in the amended environment clearance. 

Compliance report 

16

Mr. Bal Bdr Pithakoti

CID No-11307002476

Relangthang, Gakiling 

Construction of private approach road  08 April 2019 08 April 2019
  1. Sketch map of the proposed alignment
  2. Forestry clearance 
  3. public clearance verified by concerned local authority. 
17

Ms. Dechen Choden

CID No- 11312001110

Sershong, Norbuling 

Establishment of stone crushing unit at Thrawar Khola, Sershong Gewog  08 April 2019 08 April 2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction
  3. Public clearance verified by concern local authority. (signature on public clearance submitted is from the proponent and you are requested to submitted from affected individuals)
  4. Assurance letter from BPC (Bhutan Power Corporation)
  5. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
18

Mr. Lhakpa Tshering, 

CID No- 1080600420

Paro Dzongkhag

Establishment of stone crushing unit at Thrawar Khola, Sershong Gewog  08 April 2019 08 April 2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction
  3. Public clearance verified by concern local authority. (signature on public clearance submitted is from the proponent and you are requested to submitted from affected individuals)
  4. Assurance letter from BPC (Bhutan Power Corporation)
  5. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
19

Mr. Tenzin Dema

CID No-11515002448

Dekiling Gewog

Establishment of stone crushing plant a Dolkhola, Dekiling Gewog 

09 April 2019 09 April 2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction
  3. Public clearance verified by concern local authority. (signature on public clearance submitted is from the proponent and you are requested to submitted from affected individuals)
  4. Assurance letter from BPC (Bhutan Power Corporation)
  5. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
20

Mr. Phuntsho 

Sunshine Mineral Export 

Establishment of stone crushing plant at Taklai Khola  03 April 2019 03 April 2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction
  3. Public clearance verified by concern local authority. (signature on public clearance submitted is from the proponent and you are requested to submitted from affected individuals)
  4. Assurance letter from BPC (Bhutan Power Corporation)
  5. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
21

Mr. Krishna Bdr Thapa 

CID No- 11307001375

Saguri, Gakiling Gewog 

Construction of access road  10 September 2019 10 September 2019
  1. Sketch map of the proposed alignment
  2. Forestry clearance 
  3. public clearance verified by concerned local authority.
  4. Filled IEE form for road 
  5. Lag Thram copy 
22

Budhi Man Nepal

Coordinator ofGelephu Waste Management 

Development of ecology, environment recreation and waste management at Maochu river  08 January 2019 08 January 2019
  1. Forestry clearance 
  2. public clearance verified by concerned local authority.
  3. Filled IEE form for main activity and ancillary activities  
23 Mr. Nomba and group  Construction of access road  05 November 2019 05 November 2019
  1. Filled IEE form for road (Attached) 
  2. Sketch map of the proposed road 
  3. Forestry clearance if the proposed road falls on SRF 
  4. Take off clearance for DoR if the road needs take-off from the GC road. 
  5. Application fee (800/-)
24

Harka Bdr Rai 

CID No- 11307001111 

Gakiling Gewog

Construction of access road  11 March 2019 11 March 2019
  1. Filled IEE form for road (Attached) 
  2. Sketch map of the proposed road 
  3. Forestry clearance if the proposed road falls on SRF 
  4. Take off clearance for DoR if the road needs take-off from the GC road. 
  5. Public clearance verified by Gewog administration 
  6. Application fee and environment clearance processing fee 
25

Sonam Tshomo

CID No. 11505002256

 

Establishment of stone crushing unit at Kholatar, Bhur, Samtenling Gewog  05 May 219 05 May 2019

E C Issued on 15/08/2019 upon submission of all additional documents on the same date

26

Tandin Wangdi 

Tshogpa, Tashiphu Chiwog 

Construction of access road  24 June 2019 24 June 2019

EC Issued upon submission of all additional documents on the same date 

27

 Gup

Chuzergang Gewog Administration 

Construction of five access road at different location  08 July 2019 08 July 2019

EC issued upon submitting all the additional documents asked on the same date 

28

Karma Namgay

M D of Mercury Bhutan Travel Pvt. Ltd

Sershong Gewog 

Establishment of Ecotourism Activities at Tsachu area 08 May 2019 08 May 2019

Denied its proposal 

  

29

Gup, Singye Gewog Administration

Realignment of farm road and construction of suspension bridge at Samatung River  16 August 2019 16 August 2019

EC issued upon submitting additional documents on 9/10/2019

30

Tshewang Dorji 

CID No. 11410007155

Thimphu

Establishment of stone crushing plant at Kholatar, Samtenling Gewog  16 August 2019 16 August 2019

EC approval denied as the carrying capacity of the location is already exceeding. 

 

Gup, Singye Gewog Administration 

Construction of MPH in SRF at Gewog Center  22 August 2019 22 August 2019

EC issued on 9/10/2019 upon submission of additional documents on the same date 

32

Gup, Sershong Gewog Administration 

Construction of access road at Pangkhar, Sershong Gewog

22 August 2019 22 August 2019
  1. Duly filled IEE form 
  2. Forestry clearance 
  3. Public clearance
  4. KMZ file/ sketch map of the alignment  
  5. Application fee
33

Mongal Signh Rai

Shompangkha Gewog

Construction of private road  22 August 2019 22 August 2019
  1. Forestry clearance 
  2. Sketch map of the alignment
  3. Public clearance verified by Gewog Administration 
  4. DoR clearance if the take-off is from highway 
  5. Application fee 
34

Lam Tshewang Dorji(Manager)

Droduel Phandayling Chorten construction 

Renewal of EC for Droduel Phendayling Chorten Construction  22 August 2019 22 August 2019

EC Renewed upon submission of additional documents 

35

Nim Dem Stone crushing Unit, Gelephu

Renewal of EC for Stone Crushing Unit  22 August 2019 22 August 2019

EC renewed after submitting all additional documents on 30/08/2019

36

Gup, Taraythang Gewog Administration 

Construction of Multi-Purpose Sheet  22 August 2019 22 August 2019
  1. Duly filled IEE form 
  2. Forestry clearance 
  3. Drawing of the structure 
  4. Public clearance 
  5. Application fee 
37

Chencho Gyeltshen 

General Manager of KD stone crushing unit, Gelephu

Renewal of EC for stone crushing unit at Dol-Khola, Dekiling  22 August 2019 22 August 2019

EC renewed after submitting all additional documents on 30/08/2019

38

Mr. Krishna Bdr. Kharka. 

CID No. 11302002260

Jachu Gakiling Gewog. 

Constuction of private road to his land/plot from Tserang-Gelephu Highway.  30 August 2019  30 August 2019 
  1. Forestry clearance from Sarpang Divisional Forest Office
  2. Public clearance veriefied by Gewog Administration and Chiwog Tsogpa. 
  3. Gewog Administrative Approval 
  4. Clearance from DoR 
  5. Application fee and Environment Clearance processing fee. 
39

Gup

Gakiling Gewog Administration 

Dredging along the Hilly khola and construction of walls  30 August 2019 30 August 2019

Application forwarded to DoFPS on 9/10/2019

 

40

Gup

Singye Gewog Administration 

Construction of chiwog center at Reshong 30 August 2019 30 August 2019 EC issued on 9/10/2019 upon submission of additional documents on the same date 
41

Gup

Singye Gewog Administration 

construction of chiwog center at Sangaythang 30 August 2019 30 August 2019 EC issued on 9/10/2019 upon submission of additional documents on the same date 
42

Mr. Dawa Tamang, CID No. 11311000842

Establishment of stone crushing unit at Kholatar in private land, Samtenling Gewog 30 August 2019 30 August 2019

EC denied (10/10/2019)

43

Yeshi Wangdi, CID No. 11703002155

Establishment of stone crushing unit at Private leased land, Jigmeling, Dekiling Gewog O5 September 2019 O5 September 2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Project proposal submitted is inadequate. Please submit professional project proposal document. 
  3. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction.
  4. Assurance letter from NRDCL. 
  5. Assurance letter from BPC (Bhutan Power Corporation)
  6. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
44

Gup, Shompangkha Gewog Administration 

Construction of farm road from Dargaythang to Khardara 06 September 2019 06 September 2019 EC issued on 9/10/2019 upon submission of additional documents on the same date 
45

Gem Dorji 

Gem Stone Crushing Unit 

Mao-Khola, Gelephu 

Establishment of stone crushing unit at Mao-Khola, Gelephu Gewog  06 September 2019 06 September 2019

EC issued on 9/10/2019 upon submission of additional documents on the same date 

46

Aita Singh Ghaley, Chokhorling, Dekiling Gewog

Renewal of Environment Clearance  06 September 2019 06 September 2019 EC renewed on 9/10/2019 upon submission of additional documents on the same date 
47

Mr. Bal Bdr. Chhetri, Sangaythang Chiwog, Singye Gewog.

Construction of access road to his/her land 10/09/2019 10/09/2019  

EC renewed on 9/10/2019 upon submission of additional documents on the same date 

48

Kuenzang Chophel, Chokhorling, Dekiling Gewog

Surface collection from private registered land  09/10/2019 09/10/2019 Site visit on pending 
49

Yeshi Dema, Dolingang, Dekiling Gewog

Surface collection from private registered land  15/10/2019 15/10/2019 Forestry clearance 
50

Yeshi Wangdi, Proprietor of M/s. Sonam Pelber stone crusher plant, Jigmeling, Dekiling Gewog

Surface collection from private registered land  26/09/2019 26/09/2019 DAA issued and application forwarded to DoFPS
51

Karma Tenzin, Proprietor of M/s Eight Builders Crusher Plant, Gelephu

Surface collection and dredging from Upper Paitha-Khola (From SRF) 26/09/2019 26/09/2019 DAA issued and application forwarded to DoFPS (09/10/2019)
52

Samdrup, Proprietor of M/s Samdrup Construction Pvt. Ltd, Gelephu

Surface collection and dredging from Upper Paitha-Khola (From SRF) 26/09/2019 26/09/2019 DAA issued and application forwarded to DoFPS (09/10/2019)
53

Kuenzang Dorji, Proprietor of M/s Yangchenma Construction Pvt. Ltd, Gelephu

Surface collection and dredging from Upper Paitha-Khola (From SRF) 27/09/2019 27/09/2019 DAA denied (09/10/2019)
54

Sonam Tobgay Dorji, Proprietor of Nima Construction Pvt. Ltd, Gelephu

Surface collection and dredging from Upper Paitha-Khola (From SRF) 30/09/2019 30/09/2019 DAA denied (09/10/2019)
55

Kunzang Tshomo Drukpa, Proprietor of Soksum Hiring Pvt. Ltd, Gelephu

surface collection and dredging from Upper Paitha-Khola (From SRF) 30/09/2019 30/09/2019 DAA denied (09/10/2019)
56

Mindu Tshering, Proprietor of Mindu Construction Pvt. Ltd, Gelephu

surface collection and dredging  from Upper Paitha-Khola (From SRF) 30/09/2019 30/09/2019 DAA denied (09/10/2019)
57

Arjun Rai, Proprietor of Arjun Construction Pvt. Ltd, Gelephu

surface collection and dredging from Upper Paitha-Khola (From SRF) 30/09/2019 30/09/2019 DAA denied (09/10/2019)
58

Karma Wangchuk, Chumay, Bumtang

Surface collection and dredging from private registered land at Lalaidab, Umling  19/09/2019 19/09/2019 DAA issued and application forwarded to DoFPS
59

Ugyen Penjor, Proprietor of Aiepoli Stone Crusher Plant, Gelephu

Surface collection and dredging from Aiepoli-Khola, Samtenling Gewog 19/09/2019 19/09/2019 DAA issued and application forwarded to DoFPS
60

Durga Prasad Acharja, Shompangkha, Sarpang

Surface collection and dredging from private registered land at Sarpang-khola 19/09/2019 19/09/2019 EC renewed on 9/10/2019 upon submission of additional documents on the same date 
61

Kuenley Dorji, Jigmeling, Dekiling Gewog

Surface collection from private registered land  14/08/2019 14/08/2019 DAA issued and application forwarded to DoFPS (02/09/2019)
62

Deki, Sershong gewog 

Surface collection from private registered land  13/08/2019 13/08/2019 DAA issued and application forwarded to DoFPS (15/08/2019)
63

Uyen Nima, Dekiling, Dekiling Gewog

Surface collection from private registered land  14/05/2019 14/05/2019 DAA issued and application forwarded to DoFPS (08/07/2019)
64

Surja Dan Ghallay, Chokhorling, Dekiling Gewog

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
65

Parsu Ram Gurung, Chokhorling, Dekiling Gewog

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
66

Sonam Lhaden, Chokhorling, Dekiling Gewog

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
67

Padam Lal Ghallay, Chokhorling, Dekiling

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
68

Hem Bdr, Ghallay, Chokhorling, Dekiling 

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
69

Bhem Bdr. Ghallay, Chokhorling, Dekiling

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
70

Lungcho Wangdi, Jigmeling, Dekiling 

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
71

Lamdoen, Jigmeling, Dekiling 

Surface collection from private registered land  08/07/2019 08/07/2019 DAA issued and application forwarded to DoFPS (23/07/2019)
72

Duba, Gelephu, Sarpang 

Surface collection from private registered land  01/07/2019 01/07/2019 DAA issued and application forwarded to DoFPS (29/07/2019)
73

Pema Dhendup, Chokhorling, Dekiling Gewog

Surface collection from private registered land  01/07/2019 01/07/2019 DAA issued and application forwarded to DoFPS (29/07/2019)
74

Sangay Chophel, Dolongang, Dekiling Gewog

Surface collection from private registered land  01/07/2019 01/07/2019 DAA issued and application forwarded to DoFPS (29/07/2019)
75

Choni Zangmo, Dolingang, Dekiling 

Surface collection from private registered land  01/07/2019 01/07/2019 DAA issued and application forwarded to DoFPS (29/07/2019)
76

Phurba La, Dolongang, Dekiling Gewog

Surface collection from private registered land  01/07/2019 01/07/2019 DAA issued and application forwarded to DoFPS (29/07/2019)
77

Phuba, Jigmeling, Dekiling

Establishment of furniture unit  20/06/2019 20/06/2019 DAA issued and forwarded the application to Department of Industry (15/07/2019)
78

Chador Tenzin, Jigmeling, Dekiling 

Establishment of Non-woven carry bag factory  23/09/2019 23/09/2019 DAA issued and forwarded the application to NECS (10/10/2019)
79

General Manager, Army welfare project, Phuntsholing

Establishment of Mineral water bottling plant  10/09/2019 10/09/2019 DAA issued and forwarded the application to NECS (18/09/2019)
80

Karma Jambay

CEO of Norbu Construction Company,Gelephu

Surface collection and dredging of RBM from Taklai-Khola B 01/10/2019 01/10/2019 EC renewed on 20/11/2019 upon submission of additional documents on the same date 
81

Tshering Wangdi, Naglam, Norbugang, Pemagatshel 

Surface collection and dredging of RBM from upper Aiepoli 19/09/2019 19/09/2019
  1. Forestry clearance 
  2. Public clearance verified by Local authorities 
  3. Gewog clearance from concerned Gewog
  4. Duly Filled IEE form for forestry projects 
  5. Environment Management Plan
  6. Sectoral clearance if applicable 
82

Dechen Wangchuk, Mendrelgang, Dekiling Gewog

Establishment of Furniture house and automobile repairing workshop  07/10/2019 07/10/2019
  1. Forestry clearance 
  2. Public clearance verified by Local authorities 
  3. Gewog clearance from concerned Gewog
  4. Duly Filled IEE form for industrial projects  
  5. Project proposal with Environment Management Plan
  6. Sectoral clearance if applicable 
  7. Power clearance 
83

Nima Khando, Ossey, Jigmecholing

Surface collection of boulders from private registered land 11/09/2019 11/09/2019
  1. Forestry clearance 
  2. Public clearance verified by Local authorities 
  3. Gewog clearance from concerned Gewog
  4. Duly Filled IEE form for forestry projects 
  5. Environment Management Plan
  6. Sectoral clearance if applicable 
84

Sangay Thenzin, Gelephu, Sarpang

Surface collection and dredging of RBM from Taklai, Lalaikhola Umling 20/09/2019 20/09/2019

DAA denied as the proponent could not meet the criteria for dredging activity set forth by DoFPS on 20/11/2019

85

Pema Tsechu, coordinator of Tashi Phenday Group, Chuzergang

Establishment of Areca-Nut Processing Unit  02/10/2019 02/10/2019
  1. Duly filled IEE form for general projects 
  2. Forestry clearance
  3. project proposal with environment management plan 
  4. Gewog clearance 
  5. Public clearance verified by concerned local authorities 
  6. Duly filled IEE form for ancillary facilities 
86

Drungyel Tshering, RNR Extension Officer, Chuzergang Gewog 

establishment of Fishery farm  12/08/2019 12/08/2019
  1. Duly filled IEE form for general projects 
  2. Forestry clearance
  3. project proposal with environment management plan 
  4. Gewog clearance 
  5. Public clearance verified by concerned local authorities 
  6. Duly filled IEE form for ancillary facilities 
87

Dzongkhag Livestock Officer, Sarpang Dzongkhag 

Establishment of fishery farm in SRF land  07/10/2019 07/10/2019
  1. Duly filled IEE form for general projects 
  2. Forestry clearance
  3. project proposal with environment management plan 
  4. Gewog clearance 
  5. Public clearance verified by concerned local authorities 
  6. Duly filled IEE form for ancillary facilities 
88

Lobzang Tshering, Gelephu-Sarpang 

Proprietor of Dendup Mines and Mineral Export

Establishment of Stone Crusher plant at Mao-Khola within 2 acres of SRF, Gelephu 3/10/2019 3/10/2019 EC renewed on 20/11/2019 upon submission of additional documents on the same date 
89

Gup, Chhudzom Gewog Administration 

Construction of following farm roads 

  1. Sukay Khola to Bakdara
  2. Norbugang Farm road to Mongarling A
  3. ORC to Mongarling C
  4. Gurung Tshongkhag to Mongarling C
  5. Khesang-Kholsi to Pelrithang C 

 

12/11/2019 12/11/2019 EC renewed on 20/11/2019 to last four proposal upon submission of additional documents on the same date 
90

Gup, Gigmecholing Gewog Administration 

Construction of following farm roads 

  1. Reti farm road 
  2. Galaychu Farm road 
  3. Mongargaon Farm road 
  4. Gairi goan farm road 
  5. Bitch Goan Farm road 
7/11/2019 7/11/2019

EC issued for the construction of Reti and Galaychu Farm road upon submitting all additional documents from Proponent on 20/11/2019

However approval for other farm roads are on pending 

91

Gup, Gelephu Gewog Administration 

Construction of Pokheral Dara farm road and Chiwog center at Raidara  21/10/2019 21/10/2019 EC renewed on 20/11/2019 to last four proposal upon submission of additional documents on the same date 
92

Ugyen Chophel, RD of BTL, Gelephu 

Construction of B-Mobile tower at Relangthang, Gakiling and Pemathang, Sershong Gewog  1/10/2019 1/10/2019 EC renewed on 20/11/2019 to last four proposal upon submission of additional documents on the same date 
93

Yonten Jamtsho, Pelrithang, Gelephu 

Installation of electric supply line to Mr. Zangphel's house at Pelrithang, Gelephu  31/10/2019 31/10/2019
  1. Duly filled Initial Environment Examination Form for transmission line 
  2. KMZ file 
94

Mr. Kharga Raj Ghalley, Chokhorling, Dekiling Gewog 

Establishment of Fabrication Unit in his own registered land at Chokhorling   18/11/2019 18/11/2019
  1. Duly filled IEE form for industry 
  2. Project proposal with Environment Management Plan
  3. KMZ file 
95

Ganish Bdr. Rai, Dechenling village, Galaythang chiwog, Chhudzom Gewog

Construction of approach road to his land  21/11/2019 21/11/2019
  1. Dully filled IEE form for road projects 
  2. Gewog Administrative Approval 
  3. Public clearance 
  4. Forestry clearance 
  5. KMZ file 
  6. Environment Clearance Processing fee 
96

Gup, Taraythang Gewog Administration 

Construction of Farm road from Tashithang to Sengichhu 16/11/2019 30/11/2019
  1. Dully filled IEE form for road projects 
  2. Gewog Administrative Approval 
  3. Public clearance 
  4. Forestry clearance 
  5. KMZ file 
  6. Environment Clearance Processing fee 
97

Yeshub Tshering, Gelephu- Sarpang 

Establishment of Stone Cruser Plant at Mao-Khola 5/11/2019 30/11/2019
  1. Duly filled IEE form (Initial Environment Examination Form). This may include, IEE form for General Projects, IEE form for road, IEE form for Forestry project  and  IEE form for Transmission line.
  2. Forestry clearance for land leasing as well as for surface collection activity, road construction, electricity supply line construction, water supply line construction
  3. Public clearance verified by concern local authority. (signature on public clearance submitted is from the proponent and you are requested to submitted from affected individuals)
  4. Assurance letter from BPC (Bhutan Power Corporation)
  5. Environment Clearance processing and application fee. (Nu.500/- application fee+2500/- if it's small scale project. Nu.30,500/- if it's medium scale project. and Nu. 50500/- if it's large scale project. Other ancillary facilities fees will be calculated as per the nature of activities required at site). 
98

Phurba Tshering, Chokhorling, Dekiling Gewog

Installation of electric supply line to organic fertilizer plant  22/11/2019 22/11/2019 KMZ file 
99

Phurba Tshering, Chokhorling, Dekiling Gewog

Construction of swimming pool at Chokhorling, Dekiling Gewog 22/11/2019 22/11/2019
  1. No objection letter from public and Gewog for the utilization of water particularly for swimming pool. 
  2. Drawings of the structure 
  3. water requirement per day in L
  4. KMZ file 
100

Sonam Pelzom 

M/s Sons Traders 

Surface collection and dredging of RBM from Taklai-Khola, Umling Gewog 1/10/2019 1/10/2019 DAA issued and application forwarded to DoFPS (20/11/2019)
101

Mrs. Ganga Maya Dhungyel

M/s Mharsid Hiring Service 

Surface collection and dredging of RBM from Taklai-Khola, Umling Gewog 1/10/2019 1/10/2019 DAA issued and application forwarded to DoFPS (20/11/2019)
102

Pelki Tobgay Gyeltshen 

M/s DS Enterprise

Surface collection and dredging of RBM from Taklai-Khola, Umling Gewog 1/10/2019 1/10/2019 DAA issued and application forwarded to DoFPS (20/11/2019)
103

Tashi Choki Dorji 

CEO of TCD Private Ltd

Thimphu

Surface collection and dredging of RBM from Taklai-Khola, Umling Gewog 1/10/2019 1/10/2019 DAA issued and application forwarded to DoFPS (20/11/2019)
104

 

       
105

 

       
106

 

       

 